The reduction in the on-site works associated with precast construction was of immense importance on this live biopharmaceutical campus
CLIENT | Genzyme |
---|---|
MAIN CONTRACTOR | SISK |
ARCHITECT | RKD Architects |
ENGINEER | PM Group |
PRECAST VALUE | €0.75m |
ONSITE DURATION | 12 weeks |
Oran Pre-Cast provided the structural frames for 2 new buildings on the site. These were a single storey frame for a new 200 seat cafeteria and a 4 storey frame for a new office building.
Key facts:
-
4 storey continuous columns
-
Bespoke beam members
-
GGBS (Ground Granulated Blast Slag) Cement
-
Gold LEED standard project
Our expertise, both in design and manufacture, allowed us to propose and deliver a number of bespoke precast beam profiles for the structure. These provided a direct interface to the architectural fixings, minimising the required on-site concrete works.