• Genzyme Waterford

The reduction in the on-site works associated with precast construction was of immense importance on this live biopharmaceutical campus
CLIENTGenzyme
MAIN CONTRACTOR SISK
ARCHITECT RKD Architects
ENGINEER PM Group
PRECAST VALUE €0.75m
ONSITE DURATION 12 weeks

Oran Pre-Cast provided the structural frames for 2 new buildings on the site. These were a single storey frame for a new 200 seat cafeteria and a 4 storey frame for a new office building.


Key facts:

  • 4 storey continuous columns

  • Bespoke beam members

  • GGBS (Ground Granulated Blast Slag) Cement

  • Gold LEED standard project

Our expertise, both in design and manufacture, allowed us to propose and deliver a number of bespoke precast beam profiles for the structure. These provided a direct interface to the architectural fixings, minimising the required on-site concrete works.