Oran Pre-Cast provided a crosswall solution to this hotel adjacent to Newcastle’s main rail station.
CLIENT | Sleeperz Hotel |
---|---|
MAIN CONTRACTOR | Metnor Group |
ARCHITECT | Clash Architects |
PRECAST VALUE | €0.4m |
ONSITE DURATION | 10 weeks |
The reduced site works associated with our twin wall and solid slab products was highly beneficial given the confined nature of this tight corner site.
All of the products were delivered on a just in time basis. The precast elements were lifted into their final position directly from the delivery trailer. This minimised the space requirements for onsite material storage, which was at a premium on this project.