• Premier InnWaterloo

The hotel development incorporates the old General Lying-In Hospital, which is a listed building

CLIENTGLI Development Ltd
MAIN CONTRACTOR SISK
ARCHITECT Dexter Moren Associates
ENGINEER Price & Myers

Oran Pre-Cast was involved in the design and manufacture of the column elements for this 234 bedroom 14 storey hotel.

There was a wide range of column sizes involved, ranging in height from 2.5m to over 4m in height.

 

A number of cast in items were provided in the columns. These included:

  • Specialist fall arrest items

  • Sockets for the temporary works and

  • Lightening conductor tape