• Chase High School

Oran Pre-Cast provided a complete precast solution for this three storey school building
CLIENTChase High School
ARCHITECT NPS Group
ENGINEER Peter Dann
PRECAST VALUE £450,000
ONSITE DURATION 7 weeks

A wide range of precast products were provided for the structure. Twinwall was used for rising walls in the foundation. Most of the vertical elements within the structure were catered for in twinwall. A number of architectural curved panels were provided using solid wall panels. Custom made steel moulds were fabricated in our steel workshop to provide a high quality surface finish.

Key design features included:

  • Curved solid wall panels

  • Exposed concrete finish

  • 8m high twinwall panels

  • Deep beam wall elements